Which order type is used for repetitive manufacturing?. Kanban order. Process order. Planned order. Production order.

What is the purpose of the pull list in material staging?. To control the flow of material from the production storage location to the central storage location. To control the flow of material from the supplier to the production storage location. To control the flow of material from the supplier to the central storage location. To control the flow of material from the central storage location to the production storage location.

What are some options for creating production orders without using trigger points? Note: There are 2 correct answers to this question. In assembly production, confirmation of scrap triggers the creation of a production order. In make-to-stock production, you can manually create production orders. In make-to-stock production, confirmation of yield for sub-assembly triggers the creation of a production order. In assembly production, a sales order triggers the creation of a production order.

Under what circumstances can you change the material type for a material if stocks, reservations, or purchasing documents exist? Note: There are 2 correct answers to this question. The same batch management level is used. The quantity and value updates are the same. The same account category is used. The same base unit of measure is used.

Your production planners are supposed to execute planning only for specific resources. What do you use to achieve this in Advanced Planning (PP/DS)?. A planning area. A planning group. A propagation range. A work center hierarchy.

Which of the following processes lead to an indicator in the planning file? Note: There are 2 correct answers to this question. Changing a dependent requirement. Changing an opera on time. Changing a storage bin. Changing a delivery address.

What happens when you set up detailed scheduling with the finite scheduling mode Insert Opera on?. An operation is scheduled as close as possible to the desired date. Operation on multi-resources are planned finitely in a sequence. To create a slot, neighboring operations are moved in both planning directions. Sequencing on multi-activity resources is automatically updated during planning.

Which operations are considered in the capacity scheduling table? Note: There are 2 correct answers to this question. Only bottleneck operations. Operations assigned to a pacemaker work center. Sub-operations. All operations.

How do you model a production line in repetitive manufacturing?. As a work center. As an operation. As a resource network. As a routing.

What will happen in the MRP run if you have created a new MRP-relevant material that supports both in-house production and external procurement?. The MRP run plans the material only if a quota on has been maintained. The MRP run starts with external procurement. The MRP run starts with in-house production. The MRP run does NOT consider the material; it has to be planned interactively.