SAP PP 2025 24
|
|
Title of test:
![]() SAP PP 2025 24 Description: SAP PP 2025 24 |



| New Comment |
|---|
NO RECORDS |
|
How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question. By plant. By change number. By material status. By material type. Which alternative item strategies are available in bills of material (BOMs)? Note: There are 2 correct answers to this question. Ranking. Simultaneous. Manual maintenance. 100% check. What does Consumption-based Planning use to determine requirements in the future? Note: There are 3 correct answers to this question. Statistical procedures. Historical values. Planning file entries. Forecasting. Dependent requirements. In the context of the capacity scheduling table, how do you define a pacemaker work center?. By assigning it to the bottleneck operation. By assigning it to the capacity scheduling table. By assigning it to the production version. By assigning it to the first opera on of a routing. What does the material type influence? Note: There are 2 correct answers to this question. Which number range interval the material number comes from. Whether value changes to financial accounting stock accounts are updated. Which plant-specific and plant-independent statuses are allowed. Which document types and class categories are allowed. Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question. Create an object selection variant for production-planning-related alerts. Assign the overall profile to the authorization profile. Create an object selection variant for alerts according to the priority of ATP categories. Assign the alert profile to the overall profile. What are the selection criteria of a bill of material (BOM) alternative? Note: There are 2 correct answers to this question. Material BOM usage. Date. Lot size. Change number. What is a prerequisite for the consumption of planned independent requirements to take place for planning strategy 40 (Planning with final assembly)?. MRP creates a planned order. A sales order is created. MRP creates a dependent requirement. A sales order is delivered. How would you define a pegging structure for an order in the context of Advanced Planning?. An evaluatetion to identify overstock situations based on the assignment of receipt and issue elements a er the product on planning run. An evaluate on to identify material or capacity shortages in the bill-of-material structure a er the production planning run. An evaluand on that is ordered according to the low-level codes of all related products and represents the coverage of issue elements with receipt elements and stock. An evaluand on that is ordered according to the bill-of-material structure of all related products and represents the relationship between receipt and issue elements. You are a consultant on an SAP S/4HANA Cloud greenfield project. Which of the following aspects should you focus on to achieve and maintain clean core data quality? Note: There are 2 correct answers to this question. Timeliness. Accuracy. Efficiency. Stability. |




