Title of test:
sap pp test 3 Description: SAP PP TEST 03 Author: sonalisawant79 Other tests from this author Creation Date: 10/12/2024 Category: Others Number of questions: 59 |
Share the Test:
New Comment
No comments about this test.
Content:
You are creating a production order manually. What activities are involved in this process? (3 Correct) Order type determination Master data selection Planning selection Capacity requirements determination Actual cost calculation. You are transferring data from SAP S/4HANAlo embedded PP/OS. What master data objects are mapped to a location? (3 Correct) Plant Work center Customer Warehouse number Supplier. You are using heuristic SAP_ERP_001. Which of the following criteria are included in the automatic source determination logic when a planned order is created? Costs Vendor rating Component availability Delivery date Quota arrangement. You are using the document management system (DMS) . Where should the DMS document links be assigned, to have them automatically copied to production orders? (2 Correct) Work center Routing header Material master Bill of material. You are working with planning strategy 40 (Planning-with-final assembly). When does consumption of planned independent requirements take place? When the MRP results are saved When you create a planned order When you create a sales order When you deliver a sales order. You define forecast consumption as an integral part of your Production Planning and Detailed Scheduling process. Which of the following order types consume the forecast? (2 Correct) Dependent demand Sales order Planned order Purchase order. You have a quality control check to avoid using a high-value component in faulty materials in subsequent assembly operations. How do you account for potentials crap of the high-value material? Enter the operation scrap and set the net indicator in the component of the bill of mater al of the assembly Enter the assembly scrap in the material master of the component and set the net indicator in the component of the bill of material of the assembly. Enter the component scrap in the component of the bill of material of the assembly and leave the net indicator initial in the bill of material. master of the assembly and set the net indicator in the routing operation where the component is used Enter the component scrap in the material. You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do? (2 Correct) Add the agreement to the source list and mark it for MRP relevance Set the creation indicator for delivery schedule lines on the initial screen of the MRP run. Add the agreement to the quota arrangement and mark it for MRP relevance. Set the creation indicator for purchase requisitions on the initial screen of the MRP run. You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past? Production order release Backflushing Material requirements planning Kanban. You need to model goods receipt processing time in Detailed Scheduling. Which modelling options do you have? (2 Correct) Model a handling resource in the location master and goods receipt time in the mater all master Model a separate resource in the production data structure. Model a transportation resource in the location master. Model a resource inbound in the location master. You produce your material based on a forecast derived from historical sales and expect it to be in inventory when your customer orders. If customers order more that the forecasted quantity, you want to increase production to try to meet the extra demand. Which is the appropriate planning strategy to use? 50 - Planning without final assembly 20 - Make to order production 40 - Planning with-final-assembly 10 - Anonymous make-to-stock. You use planning strategy Finite Scheduling - with Reverse and want to allow scheduling in the past. How can you achieve this? Specify a negative planning horizon in the strategy profile. Specify a positive offset time in the strategy profile. Specify a positive planning horizon in the strategy profile. Specify a negative offset time in the strategy profile. You want to create a production order from a planned order. What methods could you use? (2 Correct) Full conversion Individual conversion Order release Partial conversion. You want to insert an operation at a certain t me on a work center. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place? The new operation is inserted at the desired time the previously dispatched operation is moved backward. The new operation is inserted at the desired time; the previously dispatched operation is moved forward The previously dispatched operation stays assist the new operation is inserted before the dispatched operation The previously dispatched operation stays as is the new operation is inserted after the dispatched operation. You want to integrate an existing planned order into Advanced Production Planning. Which report do you use? /SAPAPO/PPDS_DELTA_ORD_TRANS /SAPAPO/CURTO_CREATE /SAPAPO/UPD_LOC_SP_PL /SAPAPO/CREATE_LOCATION. You want to perform capacity availability checks on your production orders. What must be set for this to occur? (2 Correct) Checking rule and group must be assigned. Checking control must have an overall profile assigned in customizing. PRT Availability check must be set. Indicator Relevant for finite scheduling must be set. You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend? Forecast planning Manual planning without check Material requirements planning Consumption-based planning. You want to represent setup time as a graphical object in the Detailed Scheduling Planning Board. Which actions are needed? (2 Correct) Create and assign a setup matrix with setup transition time to the resource Create and assign a new graphical object for setup time in the planning board. Create and assign setup group/setup keys in the production data structure. Run setup minimization heuristics or optimizer. You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select? Scheduling working time only Find slot Insert operation Squeezing. You want to schedule an order in the graphical planning board. What are valid planning directions? (2 Correct) Infinite sequencing Squeezing in Backwards Forward with reverse. You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials (BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is NOT possible. Which settings do you make to achieve this? Planning strategy 20 (Make-to-Order) and the corresponding Mixed MRP indicator Planning strategy 50 (Planning without final assembly) and the corresponding individual Collective indicator Planning strategy 50 (Planning without final assembly) and the corresponding Mixed MRP indicator Planning strategy 20 (Make-to-Order) and the corresponding individual Collective indicator. You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material? Planning at assembly level (70) Make-to-order production (20) Planning without final assembly (50) Planning with final assembly (40). You want to use finite scheduling. Which conditions must you meet? (3 Correct) Use a resource that is over loaded Set the scheduling direction to backward only. Use the finite resource indicator. Use a scheduling heuristic that is finite. . Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider? (2 Correct) The display template for material numbers applies to all clients. In Customizing you can decide by material type whether to use the long material number The maximum mater all number length is 40 for external numbers and 18 for internal numbers The number of leading zeros for internal numbers is client-specific. Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use? Planning without final assembly (50) Planning with final assembly (40) Make-to-stock production (10) Make-to-order production (20). Your customer is using storage location is in SAP ECC and wants to switch to SAP S/4HANA. What do you have to consider? MRP Live does NOT support storage locations, but classic MRP still does. Storage location MRP is replaced by MRP area functionality. You have to set one MRP area for every storage location. Storage locations are NO longer supported. Your customer wants to include restricted-use stock as a potential receipt in the existing ATP check for component availability. Which information is required to implement this change request in the scope of check? (2 Correct) The checking group from the material master The checking rule from the business application The checking control for the order type The ATP category for restricted-use stock. Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (P"/OS)? Use a heuristic Use a propagation range Use a planning group. Use a resource group. Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What is the impact of this decision? (3 Correct) Storage location MRP areas are required. Production orders are created with sales order reference. Net requirements calculation is sales order-specific. Sales order-specific planning run is required. Sales order-specific stock is created. Your project uses process orders for the production of liquid chemicals. What can you define to ensure that the production flow happens only in physically connected tanks? Operation network Work center hierarchy Setup matrix Resource network. Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks? Use the material where-used report. Use the material staging report. Use batch determination. Use the batch information cockpit. Which item statuses can you select inside a material BOM? (2 correct) Service Sales Quality management Engineering. What type of time element can be reduced by strategy settings while dispatching? (2 correct) Transportation time Wait time Queue time Setup time. Which of the following questions do you have to answer before you start creating a BOM? (2 correct) In which storage location is the BOM required? Which Valid To information is necessary? Is the material type allowed in the BOM? What status does the BOM have?. Which information is required when you created a production master in SAP S/4HANA? (2 correct) Selective screen for views Product type Base unit of measure Industry sector. Which actions does the system preform by default when you save a confirmation for a finished product in repetitive manufacturing? (3 correct) Posting of production costs to the production cost collector Material staging for next order in sequence Archiving of documents for assembly scrap Posting of goods receipt for the product Reduction of associated capacity requirements. What is a work center hierarchy in planning in SAP S/4HANA? A group of alternative work centers providing a cumulative available capacity for production A group of alternative work centers for production, structured in hierarchy levels by priorities A group of work centers in a production line being used in sequence for production A group of work centers in a parallel sequence that is used to split production quantities and work on them in parallel. You want to use capacity availability checks for production orders. Which settings have to be made for this? (2 correct) A checking rule must be assigned in the checking control The PRT Availability Check must be set in the checking control. An overall profile must be assigned in the checking control. The Relevant for Finite Scheduling indicator must be set. You want to set up a make-to-order planning scenario for finished material. The bill of material contains two components: one should be procured for each sales order individually, the other one should be procured jointly for all independent requirements. Forecasting for the finished product is NOT possible. Which setting do you make to achieve this? Choose planning strategy 50 (Planning without final assembly) and select corresponding Mixed MRP indicator Choose planning strategy 20 (Make-to-order) and select corresponding individual/collective indicator Choose planning strategy 20 (Make-to-order) and select corresponding Mixed MRP indicator Choose planning strategy 50 (Planning without final assembly) and select corresponding individual/collective indicator. What does forecasting in demand planning cycle include? (3 correct) Past quotation quantities Past sales order quantities Market intelligence One-off events Past procurement quantities. What do you use to dispatch operations from planned orders so that the production plan can be fulfilled? Material Requirements Planning (MRP) Capacity Requirements Planning (CRP) Supply Network Planning (SNP) Demand Planning (DP). Which times elements does MRP consider in backward scheduling to determine he order dates for components from dependent requirements? (2 correct) Planed delivery time Operation duration In-house production time Total replenishment lead time. You have a schedule agreement whit a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do? (2 correct) Set the creation indicator for delivery schedule lines on the initial screen of the MRP run Set the creation indicator for purchase requisitions on initial screen of MRP run Add the agreement to the source list and mark it for MRP relevance. Add the agreement to the quota arrangement and mark it for MRP relevance. Which standard item categories can you select inside a bill of material (BOM)? (2 correct) Non-stock item Work item Variable-size item WBS item. You want to insert an operation at a certain time on work center. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place? The previously dispatched operation stays as is; the new operation is inserted after the dispatched operation. The previously dispatched operation stays as is; the new operation is inserted before the dispatched operation. The new operation is inserted at the desired time; the previously dispatched operation is moved forward. The new operation is inserted at the desired time; the previously dispatched operation is moved backward. What does the material type influence? (2 correct) Which plant specific status is allowed Which material master views can be maintained Which document types are allowed Whether the material is produced in-house, procured externally or both. Which business processes are affected by setting in the order type-dependent parameters? (2 correct) Initiate quality inspections. Select master data. Define integration to cost accounting. Implement engineering changes. Where do you maintain data to determine the duration of an operation for production? (2 correct) Bill of material (BOM) Routing Material master Work center. In the Capacity Scheduling Table, which settings can you select for the planning strategy? (3 correct) Planning mode Finiteness level Fixed pegging Direction Scheduling control. Which methods are available for goods issue posting of material components for process orders? (2 correct) Transfer order Picking list Backflushing Kanban. When can the automatic material availability check occur in a production order? (2 correct) At order release At order confirmation At order creation At order settlement. Which SAP application can be used for forecasting in Supply Chain Planning? (2 correct) Material Requirements Planning (MRP) Supply Chain Management(SCM) Integrated Business Planning (IBP) Capacity Requirements Planning (CRP). Where do you maintain the work center that represents the production line for repetitive manufacturing? (2 correct) Production version Routing Repetitive manufacturing profile Production cost collector. In the Schedule Production app which setting can you make for the planning strategy? (3 correct) Fitness level Scheduling control Fixed pegging Direction Planning mode. Your project used process orders for the production of liquid chemicals. What can you define to ensure that the production flow happens only in physically connected tanks? Operation network Work center hierarchy Setup matrix Resource network. You set up a material as a phantom assembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material (BOM)? Change the special procurement key of the phantom assembly in the BOM. Change the explosion type of the phantom assembly in the BOM. Change the phantom item indicator for the phantom assembly in the BOM. Change the item category of the phantom assembly in the BOM. . What are the consequences if the Dispatched operation status is set for a production order operation? You can reschedule the operation using midpoint scheduling in a planning table. You can reschedule the operation using finite scheduling in planning table You can reschedule the operation using lead time scheduling in a planning table You can reschedule the order using infinite scheduling in a planning table . How can you set up the supply source for the Kanban process in SAP S/4HANA? (3 correct) Using run schedule quantities for in-house production Using quotations for internal and external procurement Using purchase orders for external procurement Using stock transfer reservations for stock transfer Using purchasing costs for automated source prioritization. For which categories can you define BOMs in SAP S/4HANA? (2 correct) Work Center Sales order Class Document Structure. |
Report abuse