Which of the following is not a way to create routing material assignments in SAP ERP? Choose the correct answer(s). A Create a material specific routing. B Copy a materials master record and the BOM and routing are automatically copied also. C In the routing header create a material assignment. D Create a production version.

Which of the following is not a pre-requisite for component allocation? Choose the correct answer(s). A Operations in the routing must exist. B Production version must exist. C BOM for the material to be produced must exist. D Backflush indicator must be set.

Any materials component that is not assigned to an operation in the routing will default to the first operation. Determine whether this statement is true or false. True. False.

Each item on the BOM can be assigned to one and only one operation on the routing. Determine whether this statement is true or false. True. False.

Component allocation to an operation is the only additional information which can be maintained with regard to components. Determine whether this statement is true or false. True. false.

Suboperations can be used for more detailed capacity planning and costing. Determine whether this statement is true or false. True. False.

When using suboperations costing is automatically done at the operation level regardless of the control keys. Determine whether this statement is true or false. True. False.

You can use user-defined fields to assign data fields to an operation or suboperation for information purposes only. Determine whether this statement is true or false. True. False.

Which of the following are ways to make changes to routings in SAP ERP? Choose the correct answer(s). A Without record of changes. B With change documents. C With history using ECM. D All of the above.

A where-used list can show you which task lists will be affected by a change in work center. Determine whether this statement is true or false. True. False.

It is not possible to make mass changes to routings using an ECM number. Determine whether this statement is true or false. True. False.