ERASED TEST, YOU MAY BE INTERESTED ON SAP PP2
COMMENTS | STATISTICS | RECORDS |
---|
TAKE THE TEST
Title of test:
SAP PP2 Description: SAP PP2 Author: sonalisawant79 Other tests from this author Creation Date: 11/12/2024 Category: Others Number of questions: 80 |
Share the Test:
New Comment
No comments about this test.
Content:
What could be the reason for multiple commitment of individual capacities, where several operations have the same scheduled dates on a resource after capacity planning? (2 Correct) The planning strategy is infinite. The Change Planning Direct on indicator is set. The work center has several individual capacities. Alternative resources are fully occupied. What data can you maintain in the sub items of a bill of material (BOM)? (2 Correct) Quantity Item type Installation point Scrap percentage. What data processing steps are obsolete if you use SAP S/4HANA Analytics? (2 Correct) Online analytical processing (OLAP) Pre computed aggregation views Online transaction processing (OLTP) Extract on, transformation, and loading (ETL). What determines whether the planned independent requirements in MRP consume other requirements? Order type Consumption sequence procedure Requirements type Requirements profile. What do you use to schedule operations from planned orders so that the production plan can be fulfilled? Supply Network Planning (SNP) Demand Planning (DP) Capacity Requirements Planning (CRP) Material Requirements Planning (MRP). What does a line hierarchy in repetitive manufacturing represent? A production line with an alternative sequence in the routing A production line with a parallel sequence in the routing A production line with more than one work center A production line with prioritized alternative work centers. What does forecasting in the demand planning cycle include? (3 Correct) Market intelligence One-off events Past procurement quantities Past quotation quantities Past sales order quantities. What does it mean for the production planner when MRP works with infinite capacities? MRP assigns capacity requirements automatically to work center is with the earliest available capacity MRP creates capacity requirements only if the work center has sufficient capacity. MRP creates capacity requirements without checking the capacity of a work center. MRP assigns capacity requirements automatically after the last scheduled order on a work center. What does the bill of material usage (BOM usage) control at the BOM item level? (2 Correct) Default values for the item status Default unit of measure Maximum allowed low-level code Allowed material type. What does the industry sector determine? (2 Correct) Whether material numbers are assigned internally or externally Which transaction you can use to create a new material Whether a material master field is required, changeable, displayed, or hidden Which material master views can be maintained. What generates capacity requirements in a process order? Activities Phases Operations Resources. What information is included in the SAP Readiness Check result for SAP S/4HANA? (3 Correct) Recommended SAP Fiori apps Relevant simplification items Recommended SAP Best Practices Custom code analysis Inconsistent data tables. What is a typical transportation processing SAP Transportation Management? Transportation Planning, Order Management, Transportation Execution, Freight Costing and Settlement, Analytics and Reporting Transportation Planning, Transportation Execution, Order Management, Freight Costing and Settlement, Analytics and Reporting Order Management, Transportation Planning, Freight Costing and Settlement, Transportation Execution, Analytics and Reporting Order Management, Transportation Planning, Transportation Execution, Freight Costing and Settlement, Analytics and Reporting. What is a work center hierarchy in SAP S/4HANA capacity planning? A group of work centers in a parallel sequence that is used to split product on quantities and work on them in parallel A group of alternative work centers for production, structured in hierarchy levels by prior ties A group of alternative work centers providing a cumulative available capacity for production A group of work centers in a production line being used in sequence for production. What is SAP’s strategic solution to perform Sales and Operations planning when you use SAP S/4HANA Manufacturing? PP Standard Sales and Operations Planning APO Demand Planning Integrated Business Planning Flexible Planning. What is the difference between co-products and by-products? Only co-products appear in the process or production order settlement rule. Only co-products are identified by a special item category in the bill of material (BOM). Only by-products have a zero inventory valuation. Only co-products can be manufactured in isolation from the main product. What is the equivalent in SAP S/4HANA of the Production Data Structure in PP/DS? (3 Correct) Bill of Material Routing Production Version Engineering Change Record. What is the first step in the MRP run? BOM explosion Source determination Lot size calculation Net requirements calculation. What is the purpose of a reporting point confirmation in repetitive manufacturing? (2 Correct) To reduce the total production lead time for along production line To provide timely updates of inventory management for the staged components To stage different components for a production line simultaneously To determine the work in progress along the production line. What is the purpose of collective orders? To post any component withdrawals single back flush with order confirmation To combine order management of co-products and by-products with the main product To postproduction costs on a cost collector instead of the production order To manage production orders for an entire finished product on multiple levels. What is the sequence of the five steps of Demand-Driven Replenishment in SAP S/4HANA? Analytics, buffer positioning, replenishment planning, buffer sizing, replenishment execution Analytics, buffer positioning, replenishment planning, replenishment execution, buffer sizing Analytics, buffer positioning, buffer sizing, replenishment planning, replenishment execution Analytics, replenishment planning, replenishment execution, buffer positioning, buffer sizing. What is the valid sequence of key activities in production order processing? Creation, release, scheduling, material withdrawal, confirmation Creation, scheduling, release, material withdrawal, confirmation Creation, scheduling, release, variance calculation, confirmation Creation, staging, release, material withdrawal, confirmation. What Kanban status automatically posts goods receipt with reference to the procurement element? Wait Full In use Empty. What must be used in the system to plan the requirements for different subcontractors separately? Storage locations MRP areas Planning plant Production versions. What steps are possible in a PP/DS production planning run? (3 Correct) Demand consumption Optimization Heuristics Detailed scheduling functions Backorder processing. When a developer creates a new SAP Fiori app, they begin by selecting a template to ensure the application has a consistent look-and-feel. What types of templates can a developer choose? (3 Correct) Web Dynpro Factsheet Transactional Maintenance view Analytical. When can the material availability check occur automatically in a production order? (2 Correct) At order settlement At order confirmation At order release At order creation. When do you recommend the use of repetitive manufacturing? (2 Correct) High product stability Low product stability High product complexity Low product complexity. When do you use variant bills of materials (BOMs)? When multiple material is have similar BOMs When multiple material also have the same BOM When a material has multiple BOMs When a material has a configurable BOM. When working with both cross-plant and plant-specific material statuses in the material master, which status has the highest priority? The cross-plant status The most restrictive status The plant-specific status The least restrictive status. When would you use reporting point backflush in repetitive manufacturing? (2 Correct) When goods issues can wait for final confirmation When you need to determine the work in progress You require an up-to-date inventory for components For production lines with short lead times. Where can you find the latest in version of the Simplification List for SAP S/4HANA? SAP Support Portal SAP Solution Manager 7.2 SAP Best Practices Explorer SAP Help Portal. Where can you maintain consumption mode and consumption periods for planning strategies? (2 Correct) In the requirements class In the plant parameters In the MRP group In the material master. Where do you maintain the duration of a product on operation? Routing Material master Bill of material (BOM) Work instructions. Where does the system check master data selection settings during the creation of planned orders and production orders? (3 Correct) In the production order type In the bill of materials (BOM) In the production version In the routing In the MRP controller. Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? (3 Correct) Archiving of documents for assembly scrap Posting of goods receipt for the product Posting of production costs to the production cost collector Reduction of associated capacity requirements Material staging for next order in sequence. Which advanced functionality has been embedded in SAP S/4HANA? (3 Correct) Capacity planning Demand planning Backorder processing Available-to-promise Supply Network Planning. Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA? (2 Correct) By usage probability Simultaneous 100% check First in first out (FIFO). Which bill of material (BOM) categories can you define in SAP S/4HANA? (2 Correct) Functional Location BOM Class BOM Work Center BOM Sales Order BOM. Which capabilities does the Alert monitor have? (3 Correct) Automatically reschedule in case of overload alerts Automatically send alerts with Alert Notification Engine Generate alerts based on defined threshold values Nominate time-dependent substitutes for a planner Automatically predict alerts in future planning cycles. Which characteristics should a material have for re-order point planning? (2 Correct) Demand remains relatively constant Replenishment lead time is known and relatively constant. Seasonal demand is relatively volatile Material replenishment is managed by the vendor (VMI). Which chart types does the tabular planning table provide in SAP S/4HANA? (2 Correct) Orders (dispatched) chart Work center capacities chart Order (pool) chart Capacity requirements chart. Which data model changes have been implemented in Sales and Distribution? (3 Correct) Elimination of customer master tables Elimination of document index tables Elimination of status tables Elimination of output condition tables Elimination of LIS tables for rebates. Which document is skipped when SAP EWM is embedded in SAP S/4HANA? Warehouse task Outbound delivery order Warehouse order Outbound delivery request. Which elements are included in the structure of the batch where-used list? (3 Correct) Purchase orders Stock transfers Collective orders Transfers from batch to batch Planned orders. Which functional capabilities does the Detailed Scheduling Board have? (2 Correct) Undo for drag & Drop planning activities Change sales order quantities Change planned order quantities Enter time-ticket confirmation for production orders. Which master data object governs the relationship between supply source and demand source in the Kanban process? Control cycle Rate routing Production supply area Replenishment strategy. Which material master data can you copy when you use the Copy Material program (transaction MMCC, Material Master Copier) to create new materials? (2 Correct) MRP area data Production version data Warehouse number data Storage location data. Which material master setting is required to use the repetitive planning table for production with production orders? The Selection Method must be set to “2 Selection by production version”. An overall profile be assigned on the Work Scheduling view At least one valid production version must exist on the MRP4 view A repetitive manufacturing profile must be assigned on the MRP4 view. Which materials have a negative quantity in a bill of materials or in a recipe? (3 Correct) Continuous flow materials Bulk materials By-products Waste products Co-products. Which material-specific information can be transferred to a transportation lane in PP/DS? (3 Correct) Purchasing info records Quota arrangements Special procurement keys Production versions Outline agreement. Which methods can you use to achieve a feasible production planning case of capacity constraints? (3 Correct) Form optimum sequences to reduce setup times. Reduce the planning window. Adjust the available capacity. Select an alternative mode on a resource. Execute a new production planning run. Which of the following apply to MRP Live? (2 Correct) Planned orders need to be converted to purchase requisitions for externally procured materials. The BAdIs for classical MRP also apply to MRP Live. The definition of the planning scope is more flexible. The sequence of planning materials is calculated across plants. Which of the following business processes are controlled by parameters that are dependent on production order type? (2 Correct) Planning Engineering change management Implementation Inspection during production. Which of the following data objects are updated when a user confirms an operation? Production order header status Shop floor information system Production order total order quantity Warehouse transfer order status. Which of the following elements does MRP take into account during net requirement calculation? (2 Correct) Lot size Safety stock Maximum stock level Purchase orders. Which of the following elements does the MRP run take into account? (2 Correct) Sales orders Shipments Material documents Planned independent requirements. Which of the following functions can be performed when the production order has the status “Created” (CRTD)? A user can schedule a background job to release production orders (transaction COOIS). A user can trigger material staging via mass processing (transaction COHV). A user trigger material availability check via mass processing (transaction COHV) A user trigger printing of shop floor paper manually (transaction CO02). Which of the following is an advantage of MRP Live and NOT available in classical MRP? (2 Correct) MRP Live can create production orders automatically MRP Live can priorities demand from sales orders MRP Live can plan materials with recursive BOMs MRP Live can propose alternative solutions. Which of the following is used by the MRP Live planning run in SAP S/4HANA? Net change planning Parallel processing across servers Planning horizon MRP list. Which of the following objects can you release so that the business transactions for process order execution and process management can be executed? (2 Correct) Individual operations Individual phases Individual control recipes Individual process instructions. Which of the following processes lead to an entry in the MRP planning file? (3 Correct) Creation of a purchasing contract Creation of a sales order Change of the material's procurement type Change of the storage bin Creation of dependent requirements. Which of the following time elements does MRP use during backward scheduling for in- house production? (2 Correct) Goods receipt processing time Planning time fence Planned delivery time Opening period. Which of these are layers in SAP Best Practice content? (3 Correct) Building blocks Process diagrams Scope items Solution packages Configuration guides. Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing? (2 Correct) Run MRP with automatic selection of production version Run MRP with quota arrangement. Run PP/DS heuristics for repetitive manufacturing Assign planned orders manual lying the planning table. Which process order function uses a resource network? Capacity leveling Resource selection Resource scheduling Capacity planning. Which reports can you access via the order and resource reporting transaction in advanced planning? (3 Correct) Operation list WIP list Production list Production overview Planning file entries. Which SAP solutions are part of the Digital Value Network portfolio? (3 Correct) Concur SAP Hybris SAP Fieldglass SAP Visual Enterprise SAP Human Capital Management. Which SAP solutions can be used for forecast ng in Supply Chain Planning? (2 Correct) Material Requirements Planning (MRP) Integrated Business Planning (IBP) Capacity Requirements Planning (CRP) Supply Chain Management (SCM). Which SAP solutions support the supplier area in the portfolio of the Digital Value Network? (3 Correct) SAP SuccessFactors SAP Field glass SAP Concur SAP S/4HANA SAP Ariba. Which task list types can have parallel sequences? (2 Correct) Reference operation sets (S) Master recipes (2) Rate routings (R) Routings (N). Which technological advances enabled the development of SAP S/4HANA as the digital core? (3 Correct) Advances in the three-tier architecture approach Wide adoption of web standards such as Service oriented architecture Big and affordable memory Capability to add to server landscape and scale Multi core processors enabling parallelism of tasks. Which time elements are part of a routing operation? (3 Correct) Queue time Float before production Pick/pack time Move time Wait time. Which time elements are relevant for lead time scheduling of a production order? (2 Correct) Planned delivery time Total replenishment lead time Setup time Float after production. Which time elements can be reduced by a reduction strategy? (3 Correct) Float after production Wait time Queue time Goods receipt processing time Move time. Which time elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements? (2 Correct) Planned delivery time Operation duration Total replenishment lead time In-house production time. Which times are used for Basic Date Scheduling of manufacturing planned orders in MRP? (2 Correct) Float before and float after production Goods receipt processing time Opening period Setup time. Which warehouse management functions are available in SAP EWM but NOT in SAP WM? (3 Correct) Expected goods receipt Labor Management Handling Unit Management Slotting Yard Management. Why would you use phantom assemblies? (3 Correct) To reduce the number of materials masters To make the assignment of components easier To increase the number of planning levels To simplify the structure of bills of materials To reduce the number of changes required in bills of materials To reduce the number of material masters. With which SAP Fiori app can you access the Guided Configuration environment for an SAP S/4HANA Cloud implementation? Manage Your Solution Manage Licenses Maintain Business Catalogs Configure Your Solution. |
Report abuse