You want to create a reservation for a material component assigned to a network activity. However, after releasing and saving the activity, no reservation is created. What are some possible reasons for missing the reservation? Note: There are 2 correct answers to this question. The material is assigned to the activity as non-stock material. The material master is set to external procurement. The availability check for material components indicates missing parts. The Reservation/Purchase Requisition indicator for the material component assigned to the activity is set to Never. A customer needs to analyze the capacity requirements of their network activities. Which reports do you recommend? Note: There are 2 correct answers to this question. Hierarchical reports. Resource reports. Cost element reports. Structure information system reports. You used reductions to reduce the scheduled duration of all internally processed activities in your project. However, the duration did not change after overall network scheduling. What could be the cause? Note: There are 2 correct answers to this question. The reduction strategy is not set in each activity. The reduction strategy is not set in the network header. The maximum reduction level is less than 100. The appropriate reduction type is not set in the parameters for network scheduling. Which of the following business processes do NOT lead to the booking of actual costs to an object? Note: There are 2 correct answers to this question. Recording of external services in the service entry sheet. Goods receipt into valuated project stock. Goods receipt of a non-stock item. Goods receipt into unvaluated project stock. |