In Make-to-order production, which field controls whether the components will be planned as sales order specific stock?
Please choose the correct answer.
The Planning Strategy of the finished product The Individual/Collective indicator of the component The MRP Type of the component The item category of the component in the BOM. Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What is the impact of this decision?
There are 3 correct answers to this question.
Net requirements calculation is sales order-specific. Sales order-specific planning run is required. Production orders are created with sales order reference. Storage location MRP areas are required. Sales order-specific stock is created. What data can you maintain in the sub items of a bill of material (BOM)?
There are 2 correct answers to this question.
Installation point Quantity Item type Scrap percentage. Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand.
Which planning strategy do you use?
Please choose the correct answer.
Make-to-order production (20) Make-to-stock production (10) Planning without final assembly (50) Planning with final assembly (40). You are using the document management system (DMS). Where should the DMS document links be assigned, to have them automatically copied to production orders?
There are 2 correct answers to this question.
Material master Bill of material Routing header Work center. Which SAP solutions can be used for forecasting in Supply Chain Planning?
There are 2 correct answers to this question.
Material Requirements Planning (MRP) Supply Chain Management (SCM) Integrated Business Planning (IBP) Capacity Requirements Planning (CRP. You want to schedule an order in the graphical planning board. What are valid planning directions?
There are 2 correct answers to this question
Infinite sequencing Squeezing in Backwards Forward with reverse. What is the purpose of collective orders?
Please choose the correct answer.
To post any component withdrawals single back flush with order confirmation To combine order management of co-products and by-products with the main product To manage production orders for an entire finished production multiple levels To post production costs on a cost collector instead of the production order. Which supply chain planning components can you find in SAP S/4HANA?
There are 2 correct answers to this question.
Advanced Planning Supply Network Planning Supply Chain Control Tower Capacity Requirements Planning. What new technology is used in SAP S/4HANA Embedded Analytics?
Please choose the correct answer.
Smart Business Cockpit Multidimensional Reporting client (MDRC) ABAP Managed Core Data Services (CDS) HANA Live. Which SAP solutions support the supplier area in the portfolio of the Digital Value Network?
There are 3 correct answers to this question.
SAP Field glass SAP Concur SAP SuccessFactors SAP Ariba SAP S/4HANA. When working with both cross-plant and plant-specific material statuses in the material master, which status has the highest priority?
Please choose the correct answer.
The cross-plant status The least restrictive status The plant-specific status The most restrictive status. Which of the following apply to MRP Live?
There are 2 correct answers to this question.
The BAdIs for classical MRP also apply to MRP Live. The definition of the planning scope is more flexible. The sequence of planning materials is calculated across plants. Planned orders need to be converted to purchase requisitions for externally procured materials. The method in which a production order is credited or debited depends on the variant of cost object controlling (COC). What basis can be used to carry this out?
There are 2 correct answers to this question.
Cost-related Product-related Milestone-related Order-related. With which SAP Fiori app can you access the Guided Configuration environment for an SAP S/4HANA Cloud implementation?
Please choose the correct answer.
Configure Your Solution Manage Your Solution Manage Licenses Maintain Business Catalogs. MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order?
Please choose the correct answer.
It is converted into a schedule line. It is converted into a planned order. It is converted into a production order. It is converted into a reservation. On which of the following levels can you influence the availability check for the components of production orders?
There are 2 correct answers to this question.
Material master Production order type MRP controller Production controller. Which document is skipped when SAP EWM is embedded in SAP S/4HANA?
Please choose the correct answer.
Warehouse order Outbound delivery request Warehouse task Outbound delivery order. Which of these are layers in SAP Best Practice content?
There are 3 correct answers to this question.
Configuration guides Process diagrams Solution packages Building blocks Scope items. In your project, you have several materials that are planned by different people. How can you assign the planning responsibility?
Please choose the correct answer.
MRP type MRP planning file MRP group MRP controller. What are the main processes of the embedded PP/OS in SAP S/4HANA?
There are 2 correct answers to this question.
Optimization of the production plan Long-term production planning Calculation of inventory buffer size Source determination for external procurement. Which options are available for an SAP S/4HANA deployment?
There are 2 correct answers to this question.
SAP S/4AHANA Enterprise Management cloud SAP S/4HANA on premise SAP S/4HANA private cloud SAP S/4HANA Professional services cloud. When do you use variant bills of materials (BOMs)?
Please choose the correct answer.
When multiple material also have the same BOM When a material has multiple BOMs When a material has a configurable BOM When multiple material is have similar BOMs. You are using heuristic SAP_ERP_001. Which of the following criteria are included in the automatic source determination logic when a planned order is created?
Please choose the correct answer.
Component availability Vendor rating Quota arrangement Costs Delivery date. For which categories can you define bills of materials (BOMs) in SAP S/4HANA?
There are 2 correct answers to this question.
Sales Order Document Structure Class Work Center. What are attributes of the SAP S/4HANA Simplification list?
There are 3 correct answers to this question.
It can have a business and a technical impact It is only a grouping of related technical simplifications It contains references to the relevant training material It details transaction and solution capabilities at a functional level It was created for better planning and estimation of your way to S/4HANA. You set up a material as a phantom assembly by entering the special procurement key in the material
master. How can you switch off the phantom assembly in a specific bill of material (BOM)? Change the special procurement key of the phantom assembly in the BOM.
Change the explosion type of the phantom assembly in the BOM.
Change the phantom item indicator for the phantom assembly in the BOM.
Change the item category of the phantom assembly in the BOM.
. Which information is required when you created a production master in SAP S/4HANA?
Selective screen for views
Product type
Base unit of measure
Industry sector
. You want to insert an operatio at a certain time on work center. The planning direction is forward.
The disired dispatching time concides with an operation that has previously been dispatched. How
does the insertion take place?
The previously dispatched operation stays as is; the new operation is inserted after the the
dispatched operation. The previously dispatched operation stays as is; the new operation is inserted before the the
dispatched operation.
The new operation is inserted at the desired time; the previously dispatched operation is moved
forward.
The new operation is inserted at the desired time; the previously dispatched operation is moved
backward. What does it mean for the production planner when MRP works with infinite capacities?
MRP assigns capacity requirements automatically after the last scheduled order on a work center MRP creates capacity requirements without checking the capacity of a work center MRP assigns capacity requirements automatically to work center is with the earliest available
capacity MRP creates capacity requirements only if the work center has sufficient capacity.
. You want to set up a make-to-order planing scenario for finished material. The bil of material
contains two components: one should be procured for each sales order individually, the other one
shold be procured jointly for all independent requirements. Forcasting for the finished product is NOT
possible. Which setting do you make to achive this?
Choose planning strategy 50 (Planning whthout final assembly) and select corresponding Mixed
MRP indicator Choose planning strategy 20 (Make-to-order) and select corresponding Invidual/collective
indicator
Choose planning strategy 20 (Make-to-order) and select corresponding Mixed MRP indicator Choose planning strategy 50 (Planning whthout final assembly) and select corresponding
Invidual/collective indicator
.
|