techno-con
![]() |
![]() |
![]() |
Title of test:![]() techno-con Description: techno22 Creation Date: 2023/01/29 Category: Others Number of questions: 72
|




New Comment |
---|
NO RECORDS |
You are running an SAP ECC system. For which of the following activities does SUM allow you to use the Near Zero Downtime Maintenance (NZDM) capabilities? There are 3 correct ANSWERs to this question. Apply SAP Support Packages. Perform an SAP S/4HANA conversion including DMO. Use DMO for SUM. Apply an Enhancement Package. Upgrade the SAP system. What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server? Choose correct ANSWERs to this question. 740. 700. 750. 731. You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime. The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel. Why are 40 Process Buckets executed in parallel? Please choose the correct. There is a maximum of 40 parallel R3load processes within this specific downtime phase. These are 40 pairs of R3load processes, so there are 80 R3load processes running. The number of CPU cores does not allow more than 40 R3load processes to be run in parallel. SUM is still running in uptime; the number of 40 defined R3load processes is considered. What do you need to know about the SAP S/4 HANA Conversion Guide? There are 2 correct ANSWERs to this question. It contains a section about the simplification item (SI) checks. It is a database-specific document. It explains where to find information about the custom code analysis. It explains the database migration option (DMO) of SUM. You are running an SAP ECC system. For which of the following activities does SUM allow you to use the Near Zero Downtime Maintenance (NZDM) capabilities? There are 3 correct answers to this question. Upgrade the SAP system. Use DMO for SUM. Apply SAP Support Packages. Perform an SAP S/4HANA conversion with DMO. Perform an S/4 HANA conversion without DMO. What phases of SUM will be executed during an SAP S/4HANA conversion including DMO? There are 3 correct ANSWERs to this question. Phase DOWNCONF_DTTRANS. Phase RUN_RSDBSCPY. Phases EU_IMPORT*. Phases DIFF*. Phase RUN_RSPTBFIL _ISUTABU. Which step can be optimized when you provide the MIGRATE_UT_DUR.XML file to SUM? Choose correct ANSWERs to this question. Silent data migration (SDM). Downtime migration. Uptime Migration. Shadow on target creation. You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results? There are 2 correct ANSWERs to this question. SE80 (Object Navigator). ATC (ABAP Test Cockpit). SAT (Runtime Analysis). SYCM (Simplification Database Content). During the configuration of the DMO for SUM, how does the tool behave if option "Do not compare table contents" is selected regarding table comparison? Please choose the correct ANSWER. It performs a comparison on selected tables using check sum. It performs a comparison on all tables using row counts. It does NOT perform any table comparison. It performs a comparison of all tables using check sum. Which downtime optimization technique requires the minimized downtime service (MDS) from SAP? Choose correct ANSWER to this question. Downtime Optimized Data Conversion (DoC). Near-Zero Downtime Maintenance (nZDM). Downtime Optimized DMO (DoDMO). Near-Zero Downtime Technology (NZDT). Which preparational steps must be performed for an SAP S/4HANA conversion? There are 2 correct ANSWERs to this question. Uninstall industry extensions not supported by SAP S/4HANA. Delete client 066 (Early Watch Client). Uninstall Fiori apps not released for SAP_UI 7.50. Install add-on SAP Gateway 7.50. During a SUM run you want to check if the phase SHADOW_IMPORT_INC is still running properly. Where can you find information about this?. Check for running batch jobs in the shadow system via Job Overview (SM37). Check for running R3load processes on the host of the primary application server. Check for the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp. Check for running R3trans processes on the host of the primary application server. Which step can be optimized when you provide the MIGRATE_DT_DUR.XML file to SUM? Choose correct ANSWERs to this question. Shadow on target creation. Downtime migration. Downtime conversion. Silent data migration (SDM). You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system. What do you need to consider? Please choose the correct ANSWER. The upgrade of the PRD must be finished before you start new development in the DEV. The transport domain of systems DEV and QAS must differ from the transport domain of system PRD. The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD. The transport between Unicode and non-Unicode systems is forbidden. You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA. The source system is non-Unicode and the target database is a scale-out system. What do you need to consider? There are 2 correct ANSWERs to this question. Network capacity between exporting and importing R3load processes must be considered. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31. The target database size increases temporarily because of the Shadow Repository. SAP HANA Landscape Reorganization requires a manual step to edit a file. During the upgrade of your development system, you run into the adjustment of non-dictionary objects, handled by transaction SPAU. There you find programs that are shown in status ‘automatic adjustment’ (green traffic light). What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP System? Please choose the correct ANSWER. SUM continues with next phase and your modifications are lost. SUM continues with next phase and your modifications are kept as in start release. SUM refuses to continue unless you have marked a transport request as modification adjustment transport. Before continuing with the next phase, SUM asks for a modification adjustment transport. Which are valid options to check the progress of the database migration in a Microsoft Windows environment? There are 2 correct ANSWERs to this question. Check the dump size of the database export on disk. Check logs for jobs starting with "RSUPG_SGEN" in the system. Check the log files written under "SUM\abap\log". Check the "Charts Control Center" in the SUM UI. Which additional configuration options are offered by SUM when selecting "Switch expert mode on" in main configuration option "Standard"? There are 2 correct ANSWERs to this question. Keep archiving on during the whole procedure. Choose the instance number of the shadow instance. Use the Near Zero Downtime Maintenance Technology (NZDM). Reuse a profile for the shadow instance from a previous run. What is the benefit of using the file UPGANA.XML from a previous SUM run? Please choose the correct. To auto-fill specific fields on selected screens on the SUM UI. To repeat specific phases during the SUM run. To make the progress information within SUM UI more accurate. To skip selected phases during the SUM run. You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion? Please choose the correct ANSWER. TABIM_UPG is executed in uptime. An additional temporary database is used during uptime. Dedicated application tables are migrated in uptime. The repository is migrated in uptime. When using the DMO of SUM, which files can be handled by SUM in the download directory? There are 2 correct ANSWERs to this question. Breakpoint configuration file SAPUPPHAS.BRK. MIGRATE_DT_DUR_XML file from a previous run. Stack XML file calculated by the Maintenance Planner. Parameter file SAPup_add.par. What do you need to consider when performing the pre-checks for an SAP S/4HANA conversion? There are 2 correct ANSWERs to this question. The pre-checks are executed in the development system and the results are transported into the subsequent systems. You need an SAP system based on AS ABAP 7.50 or above for the pre-check framework. Depending on the SAP S/4HANA version, there are different pre-check frameworks. You need to build up a pre-check framework by applying SAP notes. You want to perform S/4 HANA Conversion for your SAP ECC system. You want to utilize Downtime-optimized DMO, which steps can be moved to uptime processing Partially? Choose correct ANSWERs to this question. System Update. Data migration. Shadow on Target creation. Data Conversion. You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HANA. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion? There are 2 correct ANSWERs to this question. Kernel for target release, Linux, SAP HANA. Kernel for source release, Windows, SAP MaxDB. Kernel for target release, Windows, SAP HANA. Kernel for target release, Windows, SAP MaxDB. You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction". Where can you change this during the migration via the Utilities option of the SUM UI? There are 2 correct ANSWERs to this question. In SUM Phaselist. In DMO Migration Preparation. In SUM Parameters. In Process Control Center. In which scenarios do you need to use SUM 2.0 instead of SUM 1.0? There are 2 correct ANSWERs to this question. Using DMO when applying Support Packages to SAP ECC 6.07. Updating to SAP ECC 6.07 using DMO. Upgrading to SAP ECC 6.08 without using DMO. SAP S/4HANA conversion to SAP S/4HANA 1709. SUM was registered at the SAP Host Agent. Based on which information does the SAP Host agent determine the path to the SUM directory? Please choose the correct ANSWER. The path is taken from the URL entered in the browser to start SUM. The path was stored in file sumabap.conf during registration. The path was stored in the host_profile during registration. The path was stored to the environment of user <sid>adm during registration. You want to perform custom code check via ABAP test cockpit in preparation of your SAP S/4HANA conversion? What kind of SAP System can you use to generate the custom code migration worklist? There are 2 correct ANSWERs to this question. Solution Manager 7.2 system. An S/4HANA 1809 sandbox system. ECC system with AS ABAP 7.50 & higher. A standalone SAP system with ABAP 7.52 & above. You are performing an S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of programs & other non-dictionary repository objects (SPAU)? Please choose the correct ANSWER. Credentials of user DDIC in client 000 of the shadow system. Credentials of user DDIC in the development client of the development system. Credentials of a named user in the development client of the development system. Credentials of a named user in client 000 of the shadow system. Which step can be optimized when you provide the MIGRATE_DT_DUR.XML file to SUM? Choose correct ANSWERs to this question. Silent data migration (SDM). Downtime migration. Downtime conversion. Shadow on target creation. Which Guides contain information about SUM phases starting with "EU_CLONE_"? There are 2 correct ANSWERs to this question. The major SUM Guide. The DMO Guide. The SAP S/HANA Conversion Guide. The Application Guide. What are the benefits of using the Benchmarking option of the DMO for SUM? There are 2 correct ANSWERs to this question. You can record the modification adjustment during migration and use the transports in the next runs. You can obtain migration duration files that can be used to optimize the next runs from a previous benchmark run. You can find the optimal number of parallel R3load processes by monitoring host performance. You can verify that the content of the download directory matches the stack.XML file. During a SUM run you want to check if the phase EU_IMPORT is still running properly. Where can you find information about this? There are 2 correct ANSWERs to this question. Check for running batch jobs in the shadow system via Job Overview (SM37). Check for running R3trans processes on the host of the primary application server. Check for running R3load processes on the host of the primary application server. Check for the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp. How does SUM recognize modification adjustment transports from predecessor systems? Please choose the correct ANSWER. By searching for transport requests named <SID>K0<number>. By searching for transport requests in the file umodauto.Ist. By searching for transport requests that are assigned to the project SAP_ADJUST. By searching for transport requests in DIR_TRANS, subdirectory "transport". Which circumstances will allow SUM to run without the creation of a shadow system? Please choose the correct ANSWER. Using the main configuration option "Single System" when installing an Add-On. Using the database migration option (DMO) for SUM. Using the main configuration option "Standard" when applying SAP Support Packages. Using the main configuration option "Single System" in case of an upgrade. You are executing a standard SUM procedure to update an SAP system using main configuration mode "Standard". When will the shadow system be stopped for the last time? Please choose the correct ANSWER. As part of the cleanup process. Early in the downtime. Before the downtime starts. At the end of the downtime. You want to perform an SAP S/4HANA conversion using SUM with DMO. Which of the following statement is true about the Custom Code Analysis? There are 2 correct ANSWERs to this question. Custom code checks are shipped as SAP notes & executed in the SAP ECC system. Apply SAP notes to prepare the evaluation system. Recommended version for Reference system is AS ABAP 7.52 & above. Recommended version for ECC system should be SAP_BASIS 7.52 and above. SUM DMO stops the conversion if error persists. You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step "Configuration". For some software components you find entries in the "Calculated level" column. What does the "Calculated level" indicate for those software components? Please choose the correct ANSWER. The SAP Support Packages contained in the upgrade media. The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner. The SAP Support Packages found in the download directory. The SAP Support Packages that will be bound to the upgrade. During a SUM run you want to check if the phase TABIM_UPG is still running properly. Where can you find information about this? There are 2 correct ANSWERs to this question. Check for running batch jobs in the shadow system via Job Overview (SM37). Check for the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp. Check for running R3trans processes on the host of the primary application server. Check for running R3load processes on the host of the primary application server. What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par? Please choose the correct ANSWER. An SAP S/4HANA conversion is performed, without adapting the customer data. An upgrade of the software components is performed, without changing the database type. A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion. A change of the database type is performed, without changing the software components. You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance? There are 2 correct ANSWERs to this question. Conversion of application tables (PARCONV_UPG). Activation of dictionary objects (ACT_UPG). Switch to new repository (EU_SWITCH). Modification adjustment (SPDD). You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps are executed during the technical downtime? Choose correct ANSWERs to this question. PARDIST_SHD. PARMVNT_UPG. TABIM_UPG. ACT_UPG. You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration? There are 3 correct ANSWERs to this question. Import of upgrade and language data from the download directory in phase TABIM UPG. Import of dictionary objects from the download directory in phase DDIC_UPG. Activation of dictionary objects in phase ACT_UPG. Generation of the new ABAP loads in phase RUN_SGEN_GENER8. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE. You are planning an SAP S/4HANA conversion . Which conversion-specific tasks need to be performed during the preparation phase? There are 2 correct answers to this question. Apply the recommendations of the simplification list. Perform the migration of data into the new data structure. Check the compatibility of custom code with SAP S/4HANA. Run the database migration to the SAP HANA database. You want to execute a Unicode Conversion only. Which approach do you need to follow? Please choose the correct Answer to this question. SUM without DMO. SWPM using the Load procedure. SUM with DMO. SWPM using the Backup / Restore procedure. You are planning to upgrade your SAP ECC 6.07 non-Unicode system to SAP ECC 6.08. How can you perform this upgrade? Choose the correct answer. Combine the upgrade & the Unicode conversion using the Combined Upgrade & Unicode Conversion (CU & UC). Perform the upgrade to SAP ECC 6.08 before the Unicode conversion. Combine the upgrade & the Unicode conversion using the Twin Upgrade & Unicode Conversion (TU & UC). Perform the Unicode Conversion before the upgrade to SAP ECC 6.08. What is the difference between the benchmarking and the repetition option of the Database Migration Option (DMO) of SUM? Please choose the correct ANSWER. The repetition option allows you to repeat the complete migration. The repetition option allows you to run the migration without a shadow system. The benchmarking option allows you to migration a specified set of tables. The benchmarking option allows you to repeat the uptime migration. You are performing an S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of dictionary objects (SPDD)? Please choose the correct ANSWER. Credentials of user DDIC in the development client of the development system. Credentials of a named user in client 000 of the shadow system. Credentials of a named user in the development client of the development system. Credentials of user DDIC in client 000 of the shadow system. You want to perform an SAP S/4HANA conversion using SUM with DMO. Which of the following statement is true about the SI checks? There are 3 correct ANSWERs to this question. SI check result list needs to be addressed before executing the conversion process. SI checks are shipped as SAP notes & executed in the SAP ECC system. SUM DMO stops the conversion if error persists. The SAP ECC system should be SAP_BASIS 7.52 and above. SUM DMO displays a warning & proceed ahead with the conversion if error persists. You are performing an in place SAP S/4HANA conversion including DMO. What is the latest point in time when you can reset the procedure without losing data? Choose correct ANSWERs to this question. The start of the business downtime. The end of the business downtime. The start of the Execution roadmap step. The end of the database migration. During the SUM procedure, the phase PARCONV_UPG fails. Where can you most likely see the reason for the error? There are 2 correct ANSWERs to this question. In the corresponding R3trans log files of this phase. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory log. In the job log for the corresponding job in SM37 (Job Overview). In the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp. You are performing an SAP S/4HANA conversion for your production system. This conversion requires that certain business functions are switched on. Following SAP recommendations, how will you achieve this? There are 2 correct ANSWERs to this question. Import a transport request from the development system that contains the recording of the activation. Specify the business functions that need to be switched on during the prepare part of SUM. Activate the required business functions manually in the production system. During conversion, SUM delivers some business functions already activated. What do you need to know about the SAP ERP Upgrade and Update Guide? There are 2 correct ANSWERs to this question. It is target release specific. It contains a section "free space requirements". It contains a troubleshooting section. It is a database-specific document. You are performing an SAP S/4HANA conversion. When does the silent data migration (SDM) take place? Choose correct ANSWERs to this question. During the SUM technical downtime. During the Execution roadmap step. Before the start of the SUM technical downtime. After SUM has ended. You want to perform S/4 HANA Conversion for your SAP ECC system. You want to utilize Downtime-optimized Conversion, which steps can be moved to uptime processing Partially? There are 2 correct ANSWERs to this question. Downtime Conversion. Downtime migration. Software Update. SoT Migration. Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system before SUM continues? There are 2 correct ANSWERs to this question. Manually activate the adjusted dictionary objects. Release the transport request containing the modification adjustment. Create "modified' versions of the objects that you need to adjust. Assign the transport request as a modification adjustment transport. You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system? Please choose the correct ANSWER. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps. After the SUM roadmap step "Execution" is finished and before "Postprocessing". After the SUM roadmap step "Postprocessing" and post procedure steps are finished. What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion? Choose correct ANSWERs to this question. To optimize the migration. To optimize the main import. To optimize the conversion. To optimize the activation. During an SAP S/4HANA conversion with DMO, which of the following actions takes place during the business downtime of the SUM procedure? There are 3 correct ANSWERs to this question. Execution of SPDD modification adjustments. Creation of table structures in the new SAP HANA database. Execution of SPAU modifications adjustments. Execution of XPRAS & AIMs. Execution of eCATTs for business validation tests. Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above? There are 3 correct answers to this question. Homogeneous System Copy. Support Package Stack Update. Dual Stack Split. Database Migration. Release Upgrade. You want to perform an SAP S/4HANA conversion using SUM with DMO. After which step will SUM stop & allow you to repeat the migration ? Choose correct ANSWERs to this question. At the end of technical downtime phase. At the beginning of technical downtime. Before the downtime migration phase ( EU_CLONE_MIG_DT_RUN). After the Migration Phase EU_CLONE_MIG_DT_CREATE. After the downtime migration phase ( EU_CLONE_MIG_DT_RUN). In which case can you use near-Zero Downtime Maintenance (nZDM)? Note: There are 2 correct answers to this question. When performing an SAP S/4HANA conversion without using DMO. When performing an SAP S/4HANA conversion with DMO. When upgrading an SAP S/4HANA Server system. When upgrading an SAP ECC system with DMO. The SUM Procedure stops with an error during uptime. How can you identify the current phase, the one in which SUM encountered an error? There are 2 correct answers to this question. Check the messages shown by the SUM UI. Check the most recent entries shown in file sapevt.trc. Check the most recent entries in SAPup.log. Check the system log ( Transaction SM21 ) of the SAP system. What do you do to prepare the database migration option of a SUM procedure? There are 3 correct answers to this question. Extract the SAP HANA database installation archive. Move the R3trans update archive into the download folder. Move the stack.xml update into the download folder. Extract the SAP HANA client installation archive. Move the SPAM update archive into the download folder. You downloaded content from the SAP note 1000009 ("ASU Toolbox 2008"). Which transaction needs to be executed to use that content in the ASU Toolbox? Please choose the correct ANSWER. /ASU/SSM (ASU Simple Schedule Manager). /ASU/UPGRADE (Start ASU Toolbox in Upgrade Mode). /ASU/START (Start ASU Toolbox). /ASU/SHOW_NOTE (Show SAP Note via Web-Browser). Which of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correct answers to this question. SAP S/4HANA conversion without DMO. Benchmark tool. Prerequisite check. DMO without system update. SAP S/4HANA conversion including DMO. In which part of an upgrade does SUM allow you to generate ABAP loads ( SGEN )? There are 2 correct ANSWERs to this question. During Uptime. During Downtime. Post-Downtime. During SPDD. You want to use the Custom Code Migration Worklist via Remote Code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database? Please choose the correct ANSWER. Generate it by analyzing the specific custom code via RFC. Apply the corresponding SAP note via SAP Note Assistant. Configure it within transaction ATC. Download it from SAP Support Portal. You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB . Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question. • Unicode conversion • Upgrade to SAP ECC with SAP_BASIS 750 including database migration • SAP S/4HANA conversion without database migration. • Unicode conversion • SAP S/4HANA conversion without database migration • Database migration. • Unicode conversion • Database migration • SAP S/4HANA conversion without database migration. • SAP S/4HANA conversion including database migration • Unicode conversion. • Unicode conversion • SAP S/4HANA conversion including database migration. During a DMO procedure with SUM, after which phase is the repository first available on the target database? Please choose the correct ANSWER. Downtime migration (EU_CLONE_MIG_DT_RUN). Uptime migration (EU_CLONE_MIG_UT_RUN). Parallel distribution (PARDIST_SHD). Shadow repository creation (EU_IMPORT*). During the SUM procedure, the phase XPRAS_AIMMRG fails. Where can you most likely see the reason for the error? There are 2 correct ANSWERs to this question. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory log. In the job log for the corresponding job in SM37 (Job Overview). In the corresponding R3trans log files of this phase. You want to perform S/4 HANA Conversion for your SAP ECC system. You want to utilize Downtime-optimized DMO, which steps can be moved to uptime processing Partially? Choose correct ANSWERs to this question. System Update. Data migration. Shadow on Target creation. Data Conversion. |