What are the options if the Dispatched operation status is set for a production order operation? Note: There are 2 correct answers to this question. You can reschedule the operation in the Manage Production Operations app. You can reschedule the operation using infinite scheduling in a planning table You can reschedule the operation using finite scheduling in a planning table. You can reschedule the operation using midpoint scheduling in a planning table.
Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question. Create an object selection variant for production-planning-related alerts. Create an object selection variant for priority-category-related alerts. Assign the overall profile to the authorization profile. Assign the alert profile to the overall profile.
which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? Note: There are 3 Correct answers to this question. Material staging for next order in sequence Posting of production costs to the production cost collector posting of goods receipt for the product Reduction of associated capacity requirements Archiving of document for assembly scrap.
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question. Pick/pack time Float before production Setup time Move Time Queue time.
Which business processes are affected by settings in the order-type-dependent parameters? Note: There are 2 correct answers to this question. Define integration with cost accounting. Check material availability. Schedule production orders. Select master data.
You Have a scheduling agreement with a vendor. you want classic MRP to automatically create schedule lines in case of material shortage. what must you do? Note: there are 2 correct answers to this question. Set the creation indicator for delivery schedule lines on the initial screen the MRP run. Add the agreement to the source list and mark it for MRP relevance. Add the agreement to the quota arrangement and mark it for MRP relevance. Set the creation indicator for purchase requisition on the initial screen of the MRP run.
What are the possible results of a production planning run in Advanced Planning (PP/DS)? Note: There are 2 correct answers to this question. Planned Order Purchase Order Scheduling agreement schedule line Production Order.
You want to create a production order. What methods can you use? Note: There are 2 correct answers to this question. Create in Kanban process Create by order release Create without material Convert a purchase requisition.
You are trying to create a production order and NO valid production version can be selected. What could be the reasons? Note: There are 2 correct answers to this question. NO bills of material (BOMs) are assigned to the production versions. The order lot size is NOT within the validity range of a production version. NO production lines are assigned to the production versions.. All production versions for the material are locked.
During production order creation, several valid production versions are found. How does the system choose the production version? Alphanumeric or quota arrangement Validity period or sales order Planned order or material number Lot size or material cost.
Your company manufactures materials whose specifications differ for each manufacturing process. Which application do you have to use in SAP S/4HANA to be able to track and use this information in all areas of logistics? Batch management Process order management Engineering change management Quality management.
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 Correct answers to this question. Form optimum sequence to reduce setup times. Reduce the planning Window. Increase the capacity supply in a time-phased interval. Execute an infinite production planning run for the critical resources. Determine a time period with available capacity on the planning board.
What are some benefits of planning with planned independent requirements? Note: There are 2 correct answers to this question. Option to forecast planning for production resources Reduced production times Reduced delivery times Option to use make-to-order production.
Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA? Note: There are 2 correct answers to this question. Orders (dispatched) chart Work center capacities chart Capacity requirements chart Order (pool) chart.
In the Capacity Scheduling Table, which settings can you select for the planning strategy? Note: There are 3 correct answers to this question. Planning mode Finiteness level Scheduling control Fixed pegging Direction.
If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement? Fill up to the reorder stock level. Fill up based on the lot size procedure. Fill up to the maximum stock level. Fill up to the safety stock level.
What determines whether the planned independent requirements in demand management are consumed by other requirements? Note: There are 2 correct answers to this question. Order type Planning strategy Requirements profile Requirements type.
You need to model goods receipt processing time in detailed scheduling. Which modeling options do you have? Note: There are 3 correct answers to this question. Model a transportation lane and carrier selection in the location master. Model a separate inbound resource in the location master. Model a goods receipt time in the material master. Model a separate resource in the production data structure. Model a handling resource in the location master.
What does a line hierarchy in repetitive manufacturing represent? A production line with a parallel sequence in the routing A production line with more than one work center A production line with prioritized work centers A production line with an alternative sequence in the routing.
You use planning strategy Finite Scheduling - with Reverse and want to allow scheduling the past. How can you parameterize this in the strategy profile? Specify a positive offset time. Specify a positive planning horizon. Specify a negative planning horizon. Specify a negative offset time.
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks? Note: There are 2 correct answers to this question. Use batch derivation. Use the Batch Information Cockpit. Use batch determination Use the batch where-used list.
Which master data fields can have an impact on whether MRP creates planned orders or purchase requisitions for a material? Note: There are 2 Correct answers to this question? MRP Groups Procurement Type MRP type Material Type.
What can you use heuristics in Advanced Planning (PP/DS) for? To optimize costs and times in production plans To solve planning problems for defined objects To automate material movements in material staging To set default values in production master data.
In documentation for MRP in Advanced Planning, you read that new orders are created through infinite planning. What does this mean for the capacity requirements of a new order? MRP assigns the capacity requirements automatically after the last scheduled order on a work center. MRP creates the capacity requirements only if the work center has sufficient capacity. MRP assigns the capacity requirements automatically to work centers with the earliest available capacity. MRP creates the capacity requirements without checking the work center capacities.
You want to set up a make-to-order planning scenario for a finished material. The bill of material contains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements. Forecasting for the finished product is NOT possible. Which settings do you make to achieve this? Choose planning strategy 50 (Planning without final assembly) and select the corresponding Individual/Collective indicator. Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator. Choose planning strategy 20 (Make-to-Order) and select the corresponding Individual/Collective indicator. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Mixed MRP indicator.
For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question. The assigned routing and bill of material (BOM) must be valid in the entire validity period. The assigned routing must NOT have alternative sequences The deletion flag must NOT be set for the bill of material (BOM) or the routing The lot size range must be within the lot size range of the assigned routing. The assigned routing must be a rate routing.
What will happen in the MRP run if you have created a new MRP-relevant material that supports both in-house production and external procurement? The MRP run assumes external procurement. The MRP run assumes in-house production. The MRP run does NOT consider the material; it has to be planned interactivelty The MRP run plans the material only if a quotation has been maintained.
Which options do you have to plan both quantities and capacities during line loading in repetitive manufacturing? Note: There are 2 Correct answers to this question? Run PP/DS heuristic for repetitive manufacturing Run MRP with quota arrangement Assign planned orders manually in the planning table Assign planned orders manually in the planning table.
Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HANA. When can you use mode selection? When alternative resources are used within one operation When multiple planned orders exist on one resource When multiple operations are maintained for one product When multiple production versions are maintained for one product.
How can you support a GMP (Good Manufacturing Practice)-compliant production process? Note: There are 3 correct answers to this question. Approved resources Digital signature Recipe approval Batch record GMP-compliant flag.
Which time elements are relevant for lead time scheduling of a production order? Note: There are 2 correct answers to this question. Opening Period Float after Production setup time Total replenishment lead time.
Where do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question. Material Master Bill of material (BOM) Work Center Routing.
what is the work center hierarchy in capacity planning? a group of work center in a parallel sequence that is used to split production quantities and work on them in parallel A group of alternative work centers providing a cumulative available capacity for production a group of work centers in a production line being used in sequence for production A group of alternative work centers for production, structured in hierarchy levels by priorities.
What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 Correct answers to this question? To determine the work in progress along the production line To reduce the total production lead time for a long production line To provide timely updates of inventory management for the staged components To stage different components for a production line simultaneously.
Which of the following questions do you have to answer before you start creating a bill of material (BOM)? Note: There are 2 correct answers to this question Is the material type allowed in the BOM? In which storage location is the BOM required? Which base unit of measure does the material have? What status does the BOM have?.
Which materials have a negative quantity in a bill of material or in a recipe? Note: There are 3 correct answers to this question Continuous flow materials Co-products By-products Waste products Bulk materials.
Where do you maintain the work center that represents the production line for repetitive manufacturing? Note: There are 2 correct answers to this question Routing Production cost collector Production version Repetitive manufacturing profile.
Which information is required when you create a product master in SAP S/4HANA? Note: There are 2 correct answers to this question. Base unit of measure Product type Selection screen for plants Selection screen for views.
in your Plant, MRP is activated. which options do you have to exclude a material from the MRP run? Note: there are 2 correct answers to this question. use a specific MRP list Use a specific MRP type Use a specific material status Use a specific material group.
When you create a sales order When can consumption of planned independent requirements take place for planning strategy 40 (Planning with final assembly? When MRP creates a planned order When MRP creates a planned order When MRP creates a dependent requirement When you create a sales order.
Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question Work item Variable-size item Non-stock item WBS item.
What is the difference between co-products and by-products? Only co-products have a zero inventory valuation Only co-products can be manufactured in isolation from the main product Only co-products are identified by a special item category in the bill of material (BOM) Only co-products appear in the process or production order settlement rule.
Under what circumstances can you change the material type for a material if stocks, reservations, or purchasing documents exist? Note: There are 2 correct answers to this question. The same batch management level is used The quantity and value updates are the same The same account category is used The same base unit of measure is used.
Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers to this question. Safety Stock Forecast key figures Purchase orders Maximum stock level.
Why would you use phantom assemblies? Note: There are 3 correct answers to this question. To increase the number of planning levels To simplify the structure of bills of material To reduce the number of changes required in bills of material To make the assignment of components easier To reduce the number of material masters.
You want to insert an operation at a certain time on a work center in the graphical planning table. The planning direction is forward. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. how does the insertion take place? The previously dispatched operation stays as is; the new operation is inserted after the dispatched operation. The new operation is inserted at the desired time; the previous dispatched operation is moved forward. The previously dispatched operation stays as is; the new operation is inserted before the dispatched operation. The new operation is inserted at the desired time; the previously dispatched operation is moved backward.
What could be the reason for different combinations of components in a multiple bill of material (BOM)? Note: There are 2 correct answers to this question. Lot size BOM header status Manufacturing date BOM item status.
which of the following automation options can you use for production orders? Note: There are 2 Correct answers to this question? You can use trigger points to automatically create rework orders via confirmation. You can use mass processing to read PP master data for production orders you can use the production scheduling profile to automatically set orders to technically complete you can use mass processing to set production orders to technically complete.
For production orders, cost object controlling (COC) can be carried out on an order-related or product- related basis. Which of the following do you have to consider? Note: There are 2 correct answers to this question. Order-related COC is beneficial in a flexible production environment Product-related COC is used in manufacturing for co-products In product-related COC, all costs are debited and credited to a product cost collector. n order-related COC, individual production orders do NOT have cost segments.
What do you need to consider when working with material master numbering in SAP S/4HANA? Note: There are 2 correct answers to this question. The maximum material number length is 18 for external numbers and 18 for internal numbers. Material numbering is defined at client level. The maximum material number length is 40 for external numbers and 18 for internal numbers Material numbering is defined cross-client.
Which time elements can be reduced by a reduction strategy? Note: There are 3 correct answers to this question. Move time Goods receipt processing time Queue time Wait time Float after production.
where does the system check master data selection settings during the creation of planned orders and production orders? Note: There are 3 Correct answers to this question. in the bill of material (BOM) in the production version in the work centers in the MRP controller In the routing.
How can you set up the supply source for the Kanban process in SAP S/4HANA? Note: There are 3 correct answers to this question. Use quotations for internal and external procurement Use run schedule quantities for in-house production. Use stock transfer reservations for stock transfer. Use purchase orders for external procurement. Use purchasing costs for automated source prioritization.
You want to schedule an operation finitely, without removing other operations. Which scheduling strategy do you select? Squeeze in Insert operation Schedule in working time only Find Slot.
How can you set up a material as a phantom assembly? Note: There are 2 correct answers to this question Define the special procurement type inside the material master. Change the item category of the phantom assembly in the bill of material (BOM) Define the special procurement type inside the BOM Change the phantom item indicator for the phantom assembly in the bill of material (BOM).
You can you use capacity availability checks for production orders. which settings have to be made for this? Note: There are 2 Correct answers to this question? A checking rule must be assigned to the work centers The relevant for finite scheduling indicator must be set. The scope of check must be defined in customizing. An overall profile must be assigned in the checking control.
Your project team decided to use a make-to-order planning strategy material in discrete manufacturing. what is the impact of this decision? Note: there are 2 correct answers to this question Storage Location MRP areas are required for sales-orders-specific stock. Net requirement calculation is carried out for every sales order individually. Sales orders have to be ATP-confirmed (available-to-promise) to saved. Both the reduction of make-to-order stock and requirements occur on delivery Production orders are created with sales order reference.
Which time elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements? Note: There are 2 correct answers to this question In-house production time Planned delivery time Operation duration Total replenishment lead time.
You want to reduce planning efforts for B and C materials. Which planning procedure do you recommend? Manual Planning Without Check Advanced Planning Material Requirements Planning Consumption-Based Planning.
What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question One-off events Market intelligence Past sales order quantities Past quotation quantities Past production planning quantities.
What could be the reason for multiple commitments, where several operations have the same scheduled dates on a work center after dispatching? Note: There are 2 correct answers to this question. The work center has several individual capacities The Finite Scheduling indicator is NOT set in the strategy profile. Alternative work centers are fully occupied. The Change Planning Direction indicator is set in the strategy profile.
How can you characterize dependent requirements in material requirements planning? Note: There are 2 correct answers to this question. They are created with exact times in Advanced Planning. They are created on assembly level during the planning run. They are created when an independent requirement is created for the finished product. They are only created for multilevel bill of material (BOM) structures.
What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing? The planned order's components are copied to the picking list. The planned order generates capacity requirements The planned order's component availability is checked. The planned order is converted to a production order.
Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question. Changing the operation times in the production data structure Changing the purchasing contract in materials management Changing the stock in inventory management Changing the storage bin in warehouse management Changing the procurement type in the product master.
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that production flow only happens in suitable and physically connected tanks? Note: There are 2 correct answers to this question. Resource network Resource matrix Resource selection Resource hierarchy.
Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (PP/DS)? Use a planning area. Use a planning group. Use a resource group Use a propagation range.
What does the material type influence? Note: There are 2 correct answers to this question. Which document types and class categories are allowed Whether the material is produced in-house, procured externally, or both Which material master screens appear and in which sequence Which plant-specific and plant-independent statuses are allowed.
Your company produces a finished good based on a forecast and expects it to be in stock when customers order it. If customers order more than the forecasted quantity, this must NOT have any impact on the production program. Which planning strategy do you use? Planning without final assembly (50) Make-to-stock production (10) Planning with final assembly (40) Make-to-stock production (20).
Advanced Planning uses master data and transaction data from SAP S/4HANA In which data objects can you set the Advanced Planning flag? Note: There are 2 correct answers to this question. Material Work Center Plant Production Version.
What time element of midpoint scheduled operations can be reduced by reduction strategy settings while dispatching? Note: There are 2 correct answers to this question Setup Time Queue Teardown time Move time.
How can a material availability check be triggered automatically for a production order? Note: There are 2 correct answers to this question. By order confirmation By capacity planning By order release By mass processing.
Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA. Note: there are 2 correct answers to this question. First in First out (FIFO). Simultaneous 100% check Manual maintenance.
which SAP application can be used for forecasting in Supply Chain Planning? Note: there are 2 correct answers to this question. Supply Chain Management (SCM) Capacity Requirement Planning (CRP) Material Requirement Planning (MRP) Integration Business Planning (IBP).
What data can you maintain in the subitems of a bill of material (BOM)? Note: There are 2 correct answers to this question. Installation point Quantity Scrap percentage Item type.
How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question, By Plant By Industry By Material Status By Period.
Which master data object governs the relationship between supply source and demand source in the Kanban process? Replenishment strategy Production supply area Rate routing Control cycle.
You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past? Material requirements planning Kanban Production order release Backflushing.
How would you define pegging in the context of Advanced Planning? An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements An evaluation to verify if there are material or capacity shortages in the network after the production planning run An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run.
Generic Parent ยป Generic 1 pt What is the purpose of collective orders? To post production costs on a cost collector instead of the production order To post any component withdrawal as single backflush with order confirmation To manage production orders for an entire finished product on multiple levels To combine order management of co-products and by-products with the main product.
You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material? Planning with final assembly (40) Production by lot size (30) Planning at assembly level (70) Make-to-order production (20).